Find web pages, publications, and documents
Modified sections are highlighted yellow. All changes are in the interest of removing ambiguity, defining a standard product, and emphasising commonly missed details. The only additional requirement beyond Reference 12 is for the classification of vegetation and buildings.
Oceana Gold operates a gold mine operation in Waihi. It sought consent to acquire approximately 197.066 hectares of sensitive land at Waihi to build a portal on the Land to their Wharekirauponga Tunnel
The OIA response provides a summary of pastoral leases within the Canterbury region that had a formal full inspection since October 2018 and those leases that it was found to be a contravention/breach of the lease.
You need written consent to clear drains (except where it is a permitted pastoral activity) on a Crown pastoral lease. You do not need consent to maintain existing drains, water races, or culverts.
You need written consent to create new firebreaks on a Crown pastoral lease.
To apply for consent, complete this form.
You need written consent to spray a slope to remove vegetation, and replant in stock or forage crops on a Crown pastoral lease.