Decision Type
Discretionary pastoral activity
Published date
Reference
A5112010

For this decision summary:

  • LINZ received the application before 17 November 2022
  • the decision was made under the Crown Pastoral Land Act 1998 before the amendments taking effect on 17 November 2022.

Lease name

Styx Run

Decision

Granted

What the decision relates to

Soil disturbance

Duration of consent

2 years

Reasons for decision

The Commissioner has determined the area which soil disturbance will occur on will both provide a fence line while protecting the inherent values present given the above conditions.

Conditions of decision

Consent is granted for soil disturbance (for creating a fence line) subject to the following conditions:

  1. That the areas of disturbed soil are regularly checked for weeds that may have been present on the machinery when the soil disturbance was undertaken.
  2. That any topsoil resulting from excavations is disposed of in a tidy manner.
  3. That any track batters and earth disturbance areas be revegetated as soon as practicable.
  4. That cut-outs are installed every 30-50m in steeper sections, in order to minimise runoff and scouring.
  5. That any fencing crossing any waterway does not impede fish passage.

The Crown Pastoral Land Act 1998 provides that permission to undertake the activity may still be needed under other enactments.